EVC System BIM Objects Announced by UK Manufacturer

Baldwin Boxall has announced the availability of BIM objects for their two Emergency Voice Communication (EVC) systems – Omnicare and CARE2. The drawings are freely available from the company to anyone upon request.

BIM (Building Information Modelling) increases efficiency, reduces costs and saves time for building and infrastructure projects. There are many benefits to this type of approach for the construction industry and because of this, it is being increasingly adopted by companies worldwide.

Baldwin Boxall’s EVC systems (encompassing disabled refuge, fire telephones and disabled toilet alarms) have been well-proven and are the systems of choice for many. The company builds on its reputation for offering a complete service and will always go that extra mile for their customers. This has been proven to be the case by a recent customer survey undertaken, the results of which can be found on the company’s website www.baldwinboxall.co.uk/customer-survey/. Typical comments include “As good as it gets” and “Always consistently good.”

Commenting on the release of the drawings, Nick Baldwin, Sales & Marketing Director, said “It became quite clear that BIM drawings were soon going to become a necessary requirement. We are sure that the investment will be a good one – we have already received a good response for the drawings for both systems. Any effort we can make to help our customers can only be for the good.”

More information can be found on the company’s EVC systems can be found on their website: www.baldwinboxall.co.uk/emergency-voice-communication/ or by contacting the marketing team marketing@baldwinboxall.co.uk.

Baldwin Boxall is based in Sussex in England and all its products are designed and manufactured in the UK to a very high standard. The company has a very clear mission statement (which can easily be found on the website (www.baldwinboxall.co.uk) and is proud of its position in the industry.

More

BIM takes protection to another level

The growing use of Building Information Modelling (BIM) is becoming significant with central government requiring the use of it on all of its projects. Here, Bob Glendenning of Sherwin-Williams Protective & Marine Coatings Europe, Middle East and Africa (EMEA) tracks the relevance and benefits of BIM for protection of complex modern steel structures.

The level of protection afforded on any building where large numbers of people move about has to be proportionate to the structure. If this falls short, the time the protection provides for rescue services in the event of a real fire could be reduced and potentially the load bearing capacity of the steel breached much more quickly than anticipated, threatening the safe evacuation of people.

Increased knowledge of how real buildings react in fire and of how real fires behave has led many authorities to acknowledge that improvements in fire safety may now be possible in many instances using the BIM process and technology.

The essence of Buildings Information Modelling (BIM) is to support complex supply chains with a platform which helps collaboration, essentially enabling data sharing.

On major projects such as those rising in our major cities, there can be issues of logistics and handover of one phase to another, from concept, design, installation of products and application of fire protection.

The principles of the BIM process bring together all the data associated with that project into one place.

The UK Government’s requirement for Level 2 BIM on all central government projects means the construction industry wants to know which suppliers are BIM compliant.

Indeed, the British Constructional Steelwork Association (BCSA) for steelwork contractors has provided detailed training to more than 100 of its members, and has launched the Steel Construction BIM Charter. This means that BCSA Member companies can now be certified as meeting the requirements of both PAS 91:2013 and PAS 1192-2:2013.

The certification process requires companies to carry out an online assessment, which is then followed up by an onsite audit.

Certified companies are provided with a comprehensive document summarising the company’s BIM capability, which they can then provide to the supply chain.

The BCSA’s online directory means clients and main contractors can see which companies have been assessed against the BIM Charter, with the Charter providing a simple way to prequalify steelwork contractors.

Under BIM, an essential component addresses budgeting and cost estimating, known as 5D. This can be a valuable source of information to reach better estimates, reduce assumptions, and create a better dialogue early in a project.

Ideally, BIM 5D is used either to link model elements to unit cost or assembly processes to produce an estimate. The BIM trend of collaboration and real-time input continues to bring efficiencies to cost controls and is creating a shift in input as data, and the ability to report from the field begins to replace input from the office.

The transparency of those in the supply chain who follow the principles of BIM can help in making previously challenging projects financially sound, fit-for-purpose and more importantly – safe.

Benefits in the process are apparent for main contractors, architects, structural engineers, steel fabricators and site inspectors. Being able to access a BIM model collaboratively allows much more efficiency and versatility, particularly on projects that have global players where project team members may reside in different geographies around the world. All can access the model over the internet including cloud sharing technology as well.

At Sherwin-Williams, our own fire design estimation tool – Firetex Design Estimator 2.0 – is offering a new calculated solution to the issues of fire engineering safety, and embraces BIM with an integrated tool allowing 3D modelling data to be directly linked into the software.

This offers the capability of providing calculations for coatings thicknesses of all shapes and sizes of steel sections, fire engineering, and in the case of cellular beams, allows for any configuration of web apertures to be seamlessly designed and passed back into the model.

We believe this software helps to eliminate any personal interpretations or assumptions. Many of the buildings currently being designed present difficulties further down the line in terms of fire protection design and this software supports the industry in keeping pace with advances in design and materials.

For the steelwork fabricator, the approach under BIM means they can manage the whole process from concept to design through to delivery of materials on site including the off-site applied fire protection. The same principle could also be adopted for use with on-site applied fire protection, offering advantages to the main contractor and eventually to the owner/operator.

Once the fire protection properties have been passed back into the BIM model, future interested stakeholders can access any of that information to manage many areas such as inspection and onward building fire maintenance as well as building insurers. Even fire and rescue services could create strategies using this data.

Under the current Regulatory Reform (Fire Safety) Order 2005, those responsible for commercial buildings including the employer, owner, or any other person who has control of any part of the premises, must carry out a detailed fire risk assessment identifying the risks and hazards in the premises.

The responsible person usually has to call in a fire engineer or qualified person to assess the risk and make calculations about fire engineering design depending on the type of building and the risk.

Based on the findings of the assessment, employers need to ensure that adequate and appropriate fire safety measures are in place to minimise the risk of injury or loss of life in the event of a fire.

Although fire deaths are falling, insurers are concerned at increasing fire losses, which are at the highest level ever experienced since records began, totalling around £3.4 million per day across the UK.

Designing structures in the ambient state with no consideration for the fire condition presents unacceptable risk.

Our current industry procedures mean that this can easily happen and the burden of ensuring fire safe design, which may well include additional costly measures, is placed with either the wrong party or, in the worst case, missed altogether.

The danger in cutting corners is that the fire safety measures will be compromised. We believe the responsibility in modern building design should lie with the designer up to handover of the building and then, with full knowledge of all fire safety requirements, it becomes the responsibility of the owner-manager.

Using modern fire protection design as part of BIM can play a major part in delivering a safe, cost-effective project which meets the expectations and agreements made by all parties at the outset.

For more information contact Sherwin-Williams, tel: +44 (0)1204 521 771 or visit http://sherwin-williams.com/protectiveEMEA

More

Roan uses 3d digital model to solve pupil places shortage

Roan Building Solutions has invested in BIM (building information modelling) to deliver a £1.9m classroom complex to a primary school in the heart of London as the capital looks to accommodate its increasing number of pupils.

The new facility at Granard Primary School is Roan’s first BIM project – a process covering the entire life cycle of a building from conception to demolition in a 3D digital model of its physical and functional characteristics. Designed to meet BIM level two requirements, Roan is designing and delivering a sustainable, two-storey, standalone, classroom complex comprising of seven classrooms, open learning studios, cloakrooms, WCs, kitchen facilities and staffrooms.

On site piling at the school began in January 2015 with a guaranteed delivery date of mid-June, meaning a timescale from initial design to full completion will take just 22 weeks.

Matthew Goff, sales director at Roan Building Solutions, says: “By July 2015, BIM will be fully implemented within Roan to not only provide a smoother construction process but also to reduce costs and waste by identifying potential issues before they arise.

“3D animation allowed Granard Primary School to see their ideas formed into a realistic fly through of their building before construction starts on site and to see how it would add to the school’s existing landscape.”

Designed to surpass all sustainability targets and to meet BREEAM ‘excellent’ standards, Granard’s new building will include mono-crystalline PV panels to reduce energy costs, wind catchers to increase ventilation and sun pipes to use more natural light.

“With schools up and down the country looking for economical ways to accommodate their pupil numbers, it was clear to us we’d prefer an offsite solution because it’s just as high quality as traditional build but delivered much faster,” says Cheryl Grigg, headteacher at Granard Primary School.

“Through the 3D animation, we were able to see how the new building will be integrated into the current school environment.

“Using Roan’s regular step-by-step progress reports, the construction process will form a special project on the pupils’ curriculum and, once complete, the new build will provide high quality learning space.”

Wandsworth Borough Council has invested £10m into permanently expanding 11 primary schools across the borough with Granard Primary School being just one of the schools benefiting from a new education facility.

Matthew continues: “There is always the need for a speedy construction method which causes minimal disruption to everyday schooling activities and because of this, modular build is becoming increasingly favoured in education.”

For more information visit: http://www.roanbuildings.co.uk/roan-building-solutions-uses-offsite-build-help-increase-school-places-wandsworth/

More

Toshiba develops BIM solution for designing air conditioning projects

Toshiba Air Conditioning (a division of Toshiba Carrier UK Limited) has developed a complete Building Information Modelling (BIM) support solution for consultants, contractors and designers.

It covers the manufacturer’s full range of SMMSI, SHRMi and Mini SMMSi VRF  outdoor units , including flow selector boxes and the full range of indoor units.

The BIM package provides an accurate and easy-to-use digital representation of Toshiba’s air conditioning systems, that can be applied in standard BIM models of new and refurbished buildings, speeding up the design process and helping accurately to predict building performance.

The introduction of BIM is central to aiding companies to fall in line with the government’s four-year strategy to improve efficiency and reduce costs in the UK construction industry.

The aim  is to introduce 3D collaborative BIM to all new construction projects by 2016, with all project data encapsulated in electronic form, speeding up projects, reducing capital costs and helping to cut carbon emissions from buildings by 20 per cent.

David Dunn, general manager of Toshiba UK, says: “We very much support the drive towards BIM-based design, as there are huge gains to be reaped by all concerned. For designers and contractors it speeds up project planning, and enables quick and accurate changes that save time on site.

“For clients and end users, it helps ensure installations are delivered on time and to budget, and provides assurance that design conditions can be achieved for a building. These twin planning and predictive aspects are what makes BIM so powerful.”

Toshiba’s suite of BIM icons, based on the popular Revit platform, can be downloaded from the Business Lounge on the company’s website: www.toshiba-aircon.co.uk/business-lounge

More