FeaturedOutdoor Maintenance

Not the ‘average’ winter: Managing multi-hazard winter risks on commercial estates

Outdoor FM has traditionally relied on a relatively predictable seasonal rhythm. However, climate volatility is increasing extreme events like droughts and flash flooding, and winter 2026 may be even more unpredictable thanks to El Niño.

Although its impacts will be chiefly felt in the global south, this major weather pattern is likely to have knock on effects on the UK – and this year El Niño is predicted to be one of the strongest on record. A report by the Government Office of Science suggests the end of 2026 may see effects including more low-pressure patterns and stronger westerly winds “associated with increased storminess and an increased risk of heavy rainfall and flooding”. Conversely, 2027 will kick off with “a slightly increased risk of easterlies and northerlies… and ‘cold snaps’, characterised by a sudden drop in temperatures”.

As a result, FMs must now plan for a volatile mix of intense downpours, severe autumn and winter storms, prolonged rainfall on saturated ground. While it may be warmer on average, the sudden, severe temperature drops may still bring dangerous freezes. A warm, wet winter doesn’t diminish estate risk but creates conditions in which flooding, storm damage, slippery paths and repeated freezing and thawing can combine. Making an estate more resilient to severe weather requires facilities managers to abandon rigid calendar-based routines and plan a proactive, strategy that looks at six key areas of external estate management.

Proactive action on flood risks and blocked drainage

Rainfall across the UK escalates sharply heading into winter, jumping from a national monthly average of 91mm in September to around 120mm per month between October and January. When intense downpours hit ground that’s already saturated, existing drainage systems can be quickly overwhelmed. Blocked or neglected gullies result in standing surface water, car park flooding, and lets water get into sub-bases that will degrade the surface faster while creating slip hazards.

Facilities managers must consider how drainage, roads, paths and other parts of the estate work together, with a “prevention rather than cure” mindset. Consider proactive inspections and cleaning of drainage infrastructure at least twice annually: a major service in September removes accumulated summer silt and early autumn leaves before heavy rains arrive; a follow-up in March clears winter debris.

Effective management relies on targeted inspection and clearing methods including high-pressure water jetting, CCTV drain surveys and clearing of gullies and silt traps to prevent ponding. It’s also worth integrating Sustainable Drainage Systems (SuDS) – such as permeable paving, swales, and attenuation basins – to manage stormwater close to where it falls and reducing pressure on drainage systems.

Storm Mitigation, Arboriculture Safety, and Boundary Integrity

While average wind speeds remain relatively constant throughout the year, severe, high-impact storm events in the UK peak during autumn and winter. The threat posed by gale-force winds is increased when combined with waterlogged soil that destabilises tree root systems and increases the likelihood of large limbs breaking .

To reduce storm liabilities, facilities managers should consider professional tree surveys and tree safety risk assessments. Identifying dead, diseased or weakened branches allows risk-reduction works to be prioritised before severe winter weather arrives. Structural pruning and hedge reduction is ideally carried out between August and November – outside the active bird nesting season.

With storms in mind, it’s also worth looking at to perimeter boundaries and fences that might fail under high winds. Inspecting, repairing, and reinforcing boundary fencing prevents structural failure, maintains site security, and preserves kerb appeal.

Surface Preservation and Freeze/Thaw Damage Prevention

Unpredictable winter weather subjects access roads, loading bays, service yards, and car parks – to severe stress. In an El Niño year, we may see prolonged heavy rain followed by rapid, sub-zero temperature drops and extreme freeze/thaw cycles that will turn minor surface cracks into potholes. Ninety per cent of minor potholes can be repaired quickly and cost-effectively before colder weather expands them into costly structural failures. Crack sealing and patch repairs prevents water from penetrating to the underlying layers, while repairs to surface depressions can help prevent pooling or further degradation of the surface. Early proactive maintenance of this type can really pay for itself.

Take on Slippery Leaves – Earlier and Later in the Year

Data from the Health and Safety Executive (HSE) shows that slips, trips, and falls account for approximately thirty per cent of all non-fatal workplace injuries annually and it’s not just ice that you need to worry about. Left too long, wet leaves and moss become a dense, slick slipping hazard and this year’s unpredictable weather has increased this challenge: Just as the past summer’s drought brought earlier leaf fall, a mild, wet winter can also alter this cycle, extending leaf fall well into December. Damp conditions also create the ideal environment for moss and algae to spread across shaded pathways and access ramps.

Managing pedestrian safety requires a dynamic approach that reflects the conditions in a given year, planning leaf clearance often enough to ensure the safety of high-risk pedestrian zones.

Data-driven Snow and Ice Clearance

A misconception in a warm, wet winter is that winter gritting and ice clearance can be scaled back. In reality, a volatile climate means that mild, rainy weather can instantly give way to sharp polar conditions and overnight frosts. For snow and ice clearance, best practice demands predictive, data-driven operational planning to ensure a flexible, just-in-time response. In a more changeable climate this matters even more. Effectively managing winter risk requires real-time weather intelligence and automated service delivery: Top-tier providers integrate site-specific meteorological forecasts – including Met Office Road Surface Temperature (RST) data – to trigger gritting services even when conditions change fast, helping ensure proactive treatment before frost or ice can form.

When looking at potential winter contractors, it’s worth considering not just how data and technology can improve responsiveness but also how it can provide FMs with greater peace of mind. Snow and ice clearance is an area where detailed, record keeping – including time-stamped, GPS logs of operator visits – can be a vital defence if legal claims for slips occur.

Get Grit Bins Freeze-Ready

When a sudden cold snap hits saturated surfaces, rainwater freezes rapidly into dangerous black ice, creating hazardous conditions with little advance warning. Even when the winter seems mild, facilities managers should take precautions e.g. by ensuring on-site grit bins are inspected, maintained, and fully resupplied well before winter arrives. Grit bins give on site teams a source of dry salt to address specific freeze points and ice patches that form before their gritting contractor arrives. Best practice includes inspecting grit bins for cracks or broken lids that could let rain ruin the salt stock and making sure to replenish salt stocks early in autumn. This avoids peak-season supply chain bottlenecks and unexpected price surges. Also make sure to position grit bins near known high-risk zones like steep access ramps or shaded walkways.

Building Estate Resilience in an Unpredictable Climate

Whether its long-term climate change or this year’s El Niño, volatile and extreme weather is now the baseline operating context for UK commercial estates. Facilities managers can no longer treat winter maintenance as a seasonal afterthought or a simple car park gritting routine. By implementing a comprehensive strategy that addresses drainage capacity, tree safety, surface resilience, slip and trip hazards and by using a smarter data driven approach to respond quickly, facilities leaders can keep sites safe and compliant in any weather.

For more information contact 0800 0432 911 email enquiries@outco.co.uk or visit www.outco.co.uk

Show More

Related Articles

Back to top button